Criteria for selection:
Preferences grades:
U values to be achieved including all openings bridging etc:
| Roofs | 0.15 W/m2K |
| Walls | 0.25 W/m2K |
| Floors | 0.20 W/m2K |
| Windows/glazed doors | 1.5 W/m2K |
The works carried out in the refurbishment and new construction at The Fold can be broken down into 27 categories and we have assessed each of these to illustrate the environmental decision-making process that affected all parts of the project. Firstly the specific treatment or material that we consider qualifies for each of the grades is identified for each category. The choice of material or treatment we made at The Fold is then presented and the reasons behind that choice are then explained.
A summary of the categories, the grading and choices made in The Fold is provided in tabular format at the end.
Choice: 2. Most of our waste material was eventually sorted but not without some confrontation.
Reason: The building trade are used to having skips to throw all their waste into without consideration and getting builders to sort the waste required the development of a new mind set.
Choice: 4. Trench footing
Reason: The considerable additional cost of labour and material in a strip footing.
Choice: 1. Principally earthenware drain pipes with PU manholes. Also PU pipe on a long 150mm run for surface water.
Reason: Best choice and whilst more expensive than UPVC still affordable.
Next >> Environmental Preference Schedule Of Construction Elements, page 2